This double track module set includes four 12 foot modules (3x 4 foot sections each) that are designed to work together to create a realistic representation of the Front Street tracks running from Main St. to Chestnut St and feature the large Bay State Milling plant. The double main line will be embedded in the Front St. brick pavement. Click Here to see a comparison of the proposed plan and the Sanborn maps.

The Planned Modules

CNW Freight House
Track plan for the CNW Freight House module

This module represents the freight house that was located on the East side of Main Street. The building was a single-story brick structure with two story office space on the West end and a loading dock with three tracks on the North side. The module features the freight house and the West end of the 2 track switching yard on the North side of the main line. The yard tracks will continue to the end of the module to be picked up on the Peerless Chain module.

Peerless Chain
Track plan for the Peerless Chain module

This module represents the Peerless Chain Company located on the South side of the CNW main line. The building was a large brick structure with a loading dock on the North side. The module features the Peerless Chain building and the East end of the 2 track switching yard on the North side of the main line. The yard tracks will continue from the CNW Freight House module.

Bay State Milling
Track plan for the Bay State Milling module

This module represents the Bay State Milling Company located on both sides of the CNW main line. There were large storage silos on the South side of the main and the Milling plant on the North, with an elevator between them. Bottsford Lumber had their coal and sand tracks just West of Kansas St. and will connect to the appropriate track on the Bottsford Lumber module.

Bottsford Lumber
Track plan for the Bottsford Lumber module

This module represents the Bottsford Lumber Company located on the South side of the CNW main line as well as their ground spot on the North side. Standard Oil with several storage tanks will be featured North of the main line.

Check out the other modules I have planned

Below is a list of modules that I am planning to build. Click on a module name to learn more about it. See all of my Modules.

ModuleGroupLengthIndustriesStatusETA
Ready Mix ConcreteCNW La Crosse5 feet1In ProgressSpring, 2025
C&NW Indian Hill DistrictCNW La Crosse20 feet5In PlanningSummer, 2025
C&NW La Crosse YardCNW La Crosse20 feet1In PlanningWinter, 2025
End Modules2 feet0In PlanningSpring, 2026
Curve Modules6 feet0In PlanningSummer, 2026
Second Street, La Crosse, WICB&Q Zone 315 feet9In PlanningFall, 2026
West Avenue - La Crosse, WICB&Q Zone 315 feet5In PlanningWinter, 2025-2026
Heileman BreweryCB&Q Zone 320 feet9In PlanningSpring, 2026
Los Angeles Produce Terminal18 feet1In PlanningSpring, 2027