Chicago & North Western, Winona, MN
This double track module set includes four 12 foot modules (3x 4 foot sections each) that are designed to work together to create a realistic representation of the Front Street tracks running from Main St. to Chestnut St and feature the large Bay State Milling plant. The double main line will be embedded in the Front St. brick pavement. Click Here to see a comparison of the proposed plan and the Sanborn maps.
The Planned Modules
- CNW Freight House
This module represents the freight house that was located on the East side of Main Street. The building was a single-story brick structure with two story office space on the West end and a loading dock with three tracks on the North side. The module features the freight house and the West end of the 2 track switching yard on the North side of the main line. The yard tracks will continue to the end of the module to be picked up on the Peerless Chain module.
- Peerless Chain
This module represents the Peerless Chain Company located on the South side of the CNW main line. The building was a large brick structure with a loading dock on the North side. The module features the Peerless Chain building and the East end of the 2 track switching yard on the North side of the main line. The yard tracks will continue from the CNW Freight House module.
- Bay State Milling
This module represents the Bay State Milling Company located on both sides of the CNW main line. There were large storage silos on the South side of the main and the Milling plant on the North, with an elevator between them. Bottsford Lumber had their coal and sand tracks just West of Kansas St. and will connect to the appropriate track on the Bottsford Lumber module.
- Bottsford Lumber
This module represents the Bottsford Lumber Company located on the South side of the CNW main line as well as their ground spot on the North side. Standard Oil with several storage tanks will be featured North of the main line.
Check out the other modules I have planned
Below is a list of modules that I am planning to build. Click on a module name to learn more about it. See all of my Modules.
Module | Group | Length | Industries | Status | ETA |
---|---|---|---|---|---|
Ready Mix Concrete | CNW La Crosse | 5 feet | 1 | In Progress | Spring, 2025 |
C&NW Indian Hill District | CNW La Crosse | 20 feet | 5 | In Planning | Summer, 2025 |
C&NW La Crosse Yard | CNW La Crosse | 20 feet | 1 | In Planning | Winter, 2025 |
End Modules | 2 feet | 0 | In Planning | Spring, 2026 | |
Curve Modules | 6 feet | 0 | In Planning | Summer, 2026 | |
Second Street, La Crosse, WI | CB&Q Zone 3 | 15 feet | 9 | In Planning | Fall, 2026 |
West Avenue - La Crosse, WI | CB&Q Zone 3 | 15 feet | 5 | In Planning | Winter, 2025-2026 |
Heileman Brewery | CB&Q Zone 3 | 20 feet | 9 | In Planning | Spring, 2026 |
Los Angeles Produce Terminal | 18 feet | 1 | In Planning | Spring, 2027 |