Chicago, Burlington & Quincy Zone 3 in La Crosse, WI
This module group built by Shane Lambert is based on the Chicago, Burlington & Quincy Zone 3 in La Crosse, WI. It will be built in at least 3 sections to incorporate as much of the area as I can. I hope to start on Phase 1 in early 2025 and have all three zones done by March, 2026. These modules will be built using Tomalco Flex Track and hand-built turnouts made using Fast Tracks jigs.
Heileman Brewery in La Crosse, WI
This module represents the G. Heileman Brewery and surrounding industries in La Crosse, WI. The module set will be 24 feet long consisting of eight 4 foot modules. I had to get a little creative with the modules to get the scene to fit, turning 4 modules on the long end. The track plan follows what is currently in use today, which I have been told is about the same that it was back in 1960. A small safety wedge was added to keep the track the minimum of 4 inches from the edge in this spot. I considered leaving off the right most module, but by adding this I can include one additional business and have enough switch length to switch all of the tracks without any other helper modules.
Heileman Brewery - Click to Open in New WindowCurrent Aerial View of Heileman Brewery - Click to Open in New WindowModule Specifications
- Type:
- Single Track Switching Puzzle
- Length:
- 24 Feet
- Width:
- 24 Inches
- Track:
- Tomalco Code 100 main line, Code 83 siding, Code 70 industry tracks
- Turnouts:
- Hand built #8 on main, #6 on siding, #6 on industry tracks using fast tracks jigs
- Scenery:
- Features the Heileman Brewery in La Crosse, WI along with a couple surrounding industries.
List of Industries
Industry | Description | Spots |
---|---|---|
G. Heileman Brewery | Brewery |
|
Track 355 | Serves Norplex and La Crosse Acoustical Tile |
|
Check Out My Other Modules
Below is a list of modules that I am planning to build. Click on a module name to learn more about it. See all of my Modules.
Module | Group | Length | Industries | Status | ETA |
---|---|---|---|---|---|
Ready Mix Concrete | CNW La Crosse | 5 feet | 1 | In Progress | Spring, 2025 |
C&NW Indian Hill District | CNW La Crosse | 20 feet | 5 | In Planning | Summer, 2025 |
C&NW La Crosse Yard | CNW La Crosse | 20 feet | 1 | In Planning | Winter, 2025 |
End Modules | 2 feet | 0 | In Planning | Spring, 2026 | |
Curve Modules | 6 feet | 0 | In Planning | Summer, 2026 | |
Second Street, La Crosse, WI | CB&Q Zone 3 | 15 feet | 9 | In Planning | Fall, 2026 |
West Avenue - La Crosse, WI | CB&Q Zone 3 | 15 feet | 5 | In Planning | Winter, 2025-2026 |
Los Angeles Produce Terminal | 18 feet | 1 | In Planning | Spring, 2027 |