Chicago & Northern Western in La Crosse, WI
A group of modules built by Shane Lambert that represent the Chicago & North Western railroad operations in La Crosse, WI around the fall of 1968.
Modules
Ready Mix Concrete
For my first module, and a proof of concept, I am planning to build a single 5 foot module featuring the Ready Mix Concrete plant that was located between of the Indian Hill District and the CNW La Crosse yard. Featuring only one #6 turnout and a grade crossing for St. Andrew Street, this one should be quick and simple and allow me to demonstrate the building process. While the prototype was a much larger area, this should capture enough of the scene to make it plausible and also add another industry for operations.
Indian Hill District
When I first started planning to build an S Scale module for demonstrating operations at train shows, this was the area I wanted to model. As a Chicago & North Western fan, I wanted something close to home. Thanks to Dennis Weber from the RiverRail group, I was able to gather some useful information on the industries served in the fall of 1968 by the Chicago & North Western.
Downtown Yard
This module is based on the Chicago & North Western yard in downtown La Crosse, WI as it appeared in 1968. The module includes the C&NW Depot, Freight House and team tracks. It is designed as a 20 foot long scene using four 5 foot modules, but could be expanded by adding additional sections in the middle. The prototype used the main line for a switch lead as this yard was a dead end yard.
Check Out My Other Modules
Below is a list of modules that I am planning to build. Click on a module name to learn more about it. See all of my Modules.
Module | Group | Length | Industries | Status | ETA |
---|---|---|---|---|---|
Ready Mix Concrete | CNW La Crosse | 5 feet | 1 | In Progress | Spring, 2025 |
C&NW Indian Hill District | CNW La Crosse | 20 feet | 5 | In Planning | Summer, 2025 |
C&NW La Crosse Yard | CNW La Crosse | 20 feet | 1 | In Planning | Winter, 2025 |
End Modules | 2 feet | 0 | In Planning | Spring, 2026 | |
Curve Modules | 6 feet | 0 | In Planning | Summer, 2026 | |
Second Street, La Crosse, WI | CB&Q Zone 3 | 15 feet | 9 | In Planning | Fall, 2026 |
West Avenue - La Crosse, WI | CB&Q Zone 3 | 15 feet | 5 | In Planning | Winter, 2025-2026 |
Heileman Brewery | CB&Q Zone 3 | 20 feet | 9 | In Planning | Spring, 2026 |
Los Angeles Produce Terminal | 18 feet | 1 | In Planning | Spring, 2027 |