Free-Mo S Scale

Chicago & Northern Western in La Crosse, WI

A group of modules built by Shane Lambert that represent the Chicago & North Western railroad operations in La Crosse, WI around the fall of 1968.

Downtown La Crosse Yard

This module is based on the Chicago & North Western yard in downtown La Crosse, WI as it appeared in 1968. The module includes the C&NW Depot, Freight House and team tracks. It is designed as a 20 foot long scene using four 5 foot modules, but could be expanded by adding additional sections in the middle. The prototype used the main line for a switch lead as this yard was a dead end yard.

Chicago & North Western yard in La Crosse, WI by Shane LambertDowntown La Crosse Yard - Click to Open in New Window

The design of this yard will also allow it to be used as a staging yard for operations, or a crew can be assigned here to build up trains for crews to switch other areas. I chose to model this yard instead of the much larger Chicago, Burlington & Quincy yard due to space consideration on the module.

Module Specifications

Type:
Single Track End Module
Length:
20 Feet
Width:
24 Inches
Track:
Tomalco Track Code 100 flex on the Free-mo end to the first turnout, then Code 83 all other tracks.
Turnouts:
Turnouts leading from the main to the depot track are #8, all others are #6. All turnouts will be built using Fast Tracks jigs.
Scenery:
Detailed representation of the Downtown La Crosse, area as it was in 1968.

List of Industries

IndustryDescriptionSpots
CNW Freight HouseFreight house
  • 7 Box Cars for General Freight
Team trackDouble track team tracks with end ramps for loading and unloading of freight cars.
  • 10 Box Cars, Gondolas or Reefers for Consumer Goods
  • 4 Flat Cars for Trucks, Tractors, Lumber
Max BemlScrap yard
  • 3 Gondolas for Scrap

Check Out My Other Modules

Below is a list of modules that I am planning to build. Click on a module name to learn more about it. See all of my Modules.

ModuleGroupLengthIndustriesStatusETA
Ready Mix ConcreteCNW La Crosse5 feet1In ProgressSpring, 2025
C&NW Indian Hill DistrictCNW La Crosse20 feet5In PlanningSummer, 2025
End Modules2 feet0In PlanningSpring, 2026
Curve Modules6 feet0In PlanningSummer, 2026
Second Street, La Crosse, WICB&Q Zone 315 feet9In PlanningFall, 2026
West Avenue - La Crosse, WICB&Q Zone 315 feet5In PlanningWinter, 2025-2026
Heileman BreweryCB&Q Zone 320 feet9In PlanningSpring, 2026
Los Angeles Produce Terminal18 feet1In PlanningSpring, 2027